South Carolina to Connecticut Freight Shipping: LTL & FTL Rates (2026)

    South Carolina to Connecticut Freight Shipping

    915 miles3-4 days (FTL)
    Get a Free Quote for This Lane

    South Carolina → Connecticut Freight Rates

    ModeTypical Rate
    LTL$380 - $710
    FTL Dry Van$1,750 - $2,200
    Flatbed$2,200 - $2,650
    Reefer$2,200 - $2,800

    Rates are reviewed and confirmed by our freight team before dispatch. Accessorials (liftgate, residential, limited-access) and hazmat may adjust final pricing.

    Freight shipping from South Carolina, SC to Connecticut, CT covers about 915 miles, with full-truckload transit in 3-4 days. LTL (less-than-truckload) runs $380 - $710 for palletized shipments, full truckload dry van from $1,750 - $2,200, and flatbed from $2,200 - $2,650. Freight volume on this lane runs fairly balanced in both directions. Every shipment includes a Bill of Lading and cargo insurance, with pickups available within 1–3 business days of booking. Compare LTL vs full-truckload vs reefer pricing for the South Carolina–Connecticut lane instantly, then book with FMCSA-licensed carriers backed by cargo insurance.

    Every South Carolina–Connecticut shipment includes

    • FMCSA-licensed carrier matching
    • Cargo insurance & Bill of Lading
    • Freight class verification (LTL)
    • Accessorial & appointment handling

    South Carolina to Connecticut Freight FAQ

    Shipping the other way? Connecticut to South Carolina rates